How drain filling works

From your first enquiry through to a filled and documented drain, here is the sequence a specialist follows on every job across the United Kingdom.

More detail

Before the visit

  • Property address and postcode
  • Location of the drain on site
  • Age of the drain if known
  • Any existing CCTV survey reports
  • Details of what the drain was used for

No obligation

Get a free quote today

Tell a specialist what you have, where the property is, and what you need done. A free quote comes back before any work is agreed.

  • Free quote for your property
  • No obligation to proceed

Ask for a quote

  1. Describe the drain and its location

    Fill in the form with the property address and a description of the drain or sewer you need dealt with. Say whether it is a surface water drain, a foul drain or a combined run. Note roughly where it sits on the plot, whether it is under a slab, a driveway or open ground, and whether any part of it is still in use. The quote is free.

  2. A specialist calls to go over the detail

    A drain specialist will call you to ask about the pipe material, the approximate depth, the run length and what triggered the decision to decommission or fill. They may ask about neighbouring drains, manholes or connections that could affect the work.

  3. Survey of the drain run

    Where the layout is not already known, the specialist carries out a drain abandonment survey using CCTV equipment. The camera records the condition of the pipe, any existing blockages, junctions with live drains and the precise route. This information determines the filling method and the volume of material required.

  4. Written quote and method statement

    Once the survey findings are reviewed, the specialist sets out a written quote. It covers the filling material, whether foam grout, concrete or another approved fill, the method for sealing entry and exit points, and any excavation needed. You see the scope before any work begins.

  5. The filling work

    The specialist fills the redundant drain using the method the survey supports. Grout or concrete is pumped into the pipe until the run is fully consolidated. Entry points, junctions and manholes connected to the decommissioned section are sealed. Where a section of pipe needs removing before filling, that work is done first.

  6. Verification and sign-off

    After filling, the specialist checks that the material has set correctly and that no voids remain. Where the work requires documentation for a lender, insurer or local authority, the specialist produces a completion record stating the drain location, the material used, the date of the work and the extent of the run that was treated.

How it works

What you get

  • A written completion record stating what was filled, where and when
  • CCTV survey footage and a written report of the drain condition before work began
  • A sealed and filled drain run with entry and exit points closed off
  • Documentation suitable for mortgage lenders, insurers and conveyancing solicitors